- Great R-value in limited spaces
- Reflects the heat and keeps the building cooler
- Prevents water infiltration
INSTALLATION METHOD:
- Pre-cut measured length of AYR-FOIL™ to span eave-to-eave, up and over the ridgeline.
- Starting at one eave lay AYR-FOIL™ flat onto roof towards the ridge and continue down to the next side.
- Lay the next AYR-FOIL™ course parallel to the first. If using tab products, ensure the square edge faces the tab edge of the previous course of AYR-FOIL™.
- Seal the joints and make sure the entire roof line is covered with AYR-FOIL™.
- Attach furring material of choice over the AYR-FOIL™ covered roof.
- Install metal roofing over furring strips.
BE CAREFUL
For proper ventilation, do not cover any vents (ridge, cable, soffit, etc) with insulation.